Free Design DIY Design
FREE SHIPPING ON ALL ORDERS OVER $3,000
GET COUPON

Easy Finance Options

Bf Bg 37x300 Bread Pay
As low as 12 Month 0%* APR Financing
Paypal Logo
PAY IN 4. PAY LATER OPTION Always Interest-free.

Perla

Hours
:
Minutes
:
Seconds

The Perla cabinet line from Jarlin Cabinetry comes in a cream-white finish with a soft, slightly ivory tone. The reversed raised center panel door gives it a more layered, detailed look compared to a flat or shaker style. This color and style work really well in farmhouse, traditional, and transitional kitchens, and it is one of those finishes that makes a space feel lighter and more open without going full bright white.

The cabinets are all wood construction, with 1/2-inch plywood boxes and no MDF. All drawers and hinges are soft-closing, and the interior has a natural maple finish. It pairs nicely with darker hardware, such as bronze or black pulls, and looks great next to stone or marble countertops.

  • 1/2″ Thick Grade Plywood Box Construction
  • Raised Center Panel Door
  • Full Extension Soft-Closing Under-Mount Glide System
  • European Style Fully Concealed Soft-Closing Hinges
  • Five Piece Door and Drawer Face
  • 3/4″ Adjustable Shelves
  • Clear Coated Natural Maple Finish Interior
  • Full Overlay Doors and Drawers














































Shipping Time: 5 to 15 business days
Style: Shaker Style Cabinets, Full Overlay
Side Panels: Finished Side Panels
Face Frame: 3/4″ x 1 1/2″ Hardwood Face Frame Double Doweled Joint
Door Frame: 3/4″ Birch wood cosntruction
Door Center: Reversed Raised Panel MDF with Wood Veneer
Sides: 1/2″ Thick Grade Plywood
Top & Bottom (Wall): 1/2″ Thick Grade Plywood
Bottom (Base): 1/2″ Thick Grade Plywood
Back Panel: 1/2″ Thick Grade Plywood
Shelves: 3/4″ Adjustable Shelves
Base Cabinet Shelf Depth: 18″ Deep Base Shelves
Drawer Boxes: Dovetail Drawer 5/8″ Thick Solid Wood Side Panels
Drawer Glides: Full Extension Soft-Closing Under-Mount Glide System
Base Corner Supports: Metal Brackets Reinforcements
Hinges: European Style Fully Concealed Soft-Closing Hinges
Cabinet Interior: Clear Coated Natural Maple Finish Interior
Cabinet Interior with Glass Clear Coated Natural Maple Finish Interior
Assembly Method: Glue & Staple or Metal Clip Assembly
Finish: Cream White Color
Toe Kick: 1/2″ Plywood, 4 1/2″ H Toe Kick Area
Wall Cabinet Bottoms: 1/2″ thick Plywood
Certifications CARB Compliant
Door Hinges: DTC 6-way- Adjustable, Concealed, with soft Close Integrated hinge
Notes:


Perla Toe Kick

Perla Toe Kick

SKU: CS-PE-TK8
Width: 4 1/2" | Height: 1/4" | Depth: 96"
List Price: $ 53.10
Original price was: $ 53.10.
Our Price: $ 29.20
Current price is: $ 29.20.

You Save: $23.90 - 45.01% OFF

Add to cart
Perla Crown Molding

Perla Crown Molding

SKU: CS-PE-CM8
Width: - | Height: 3 1/4" | Depth: 96"
List Price: $ 206.80
Original price was: $ 206.80.
Our Price: $ 113.80
Current price is: $ 113.80.

You Save: $93.00 - 44.97% OFF

Add to cart
Perla Scribe Molding

Perla Scribe Molding

SKU: CS-PE-SM8
Width: 3/4" | Height: 1/4" | Depth: 96"
List Price: $ 47.20
Original price was: $ 47.20.
Our Price: $ 26.00
Current price is: $ 26.00.

You Save: $21.20 - 44.92% OFF

Add to cart
Perla 3″ Base Filler

Perla 3″ Base Filler

SKU: CS-PE-BF3
Width: 3" | Height: 34 1/2" | Depth: 3/4"
List Price: $ 67.90
Original price was: $ 67.90.
Our Price: $ 37.40
Current price is: $ 37.40.

You Save: $30.50 - 44.92% OFF

Add to cart
Perla 3×96 Wall Filler

Perla 3×96 Wall Filler

SKU: CS-PE-WF396
Width: 3" | Height: 96" | Depth: 3/4"
List Price: $ 159.50
Original price was: $ 159.50.
Our Price: $ 87.70
Current price is: $ 87.70.

You Save: $71.80 - 45.02% OFF

Add to cart
Perla 18″ Three Drawer Vanity Base

Perla 18″ Three Drawer Vanity Base

SKU: CS-PE-SVA18D
Width: 18" | Height: 34 1/2" | Depth: 21"
List Price: $ 870.90
Original price was: $ 870.90.
Our Price: $ 479.00
Current price is: $ 479.00.

You Save: $391.90 - 45.00% OFF

Add to cart
Perla 30″ Double Door Vanity Sink Base

Perla 30″ Double Door Vanity Sink Base

SKU: CS-PE-FA3021
Width: 30" | Height: 34 1/2" | Depth: 21"
List Price: $ 886.40
Original price was: $ 886.40.
Our Price: $ 487.50
Current price is: $ 487.50.

You Save: $398.90 - 45.00% OFF

Add to cart
Perla 24″ Panel

Perla 24″ Panel

SKU: CS-PE-FP2496
Width: 24" | Height: 96" | Depth: 3/4"
List Price: $ 334.70
Original price was: $ 334.70.
Our Price: $ 184.10
Current price is: $ 184.10.

You Save: $150.60 - 45.00% OFF

Add to cart
Perla Touch Up Kit

Perla Touch Up Kit

SKU: CS-PE-TOUCH-UP
Width: - | Height: - | Depth: -
List Price: $ 88.80
Original price was: $ 88.80.
Our Price: $ 46.00
Current price is: $ 46.00.

You Save: $42.80 - 48.20% OFF

Add to cart
Perla 12″ Three Drawer Vanity Base

Perla 12″ Three Drawer Vanity Base

SKU: CS-PE-SVA12D
Width: 12" | Height: 34 1/2" | Depth: 21"
List Price: $ 720.30
Original price was: $ 720.30.
Our Price: $ 396.20
Current price is: $ 396.20.

You Save: $324.10 - 45.00% OFF

Add to cart
Perla 36x24x24 Wall Refrigerator Cabinet

Perla 36x24x24 Wall Refrigerator Cabinet

SKU: CS-PE-W362424
Width: 36" | Height: 24" | Depth: 24"
List Price: $ 830.90
Original price was: $ 830.90.
Our Price: $ 457.00
Current price is: $ 457.00.

You Save: $373.90 - 45.00% OFF

Add to cart
Perla 30×24 Double Door Wall Bridge Cabinet

Perla 30×24 Double Door Wall Bridge Cabinet

SKU: CS-PE-W3024
Width: 30" | Height: 24" | Depth: 12"
List Price: $ 610.50
Original price was: $ 610.50.
Our Price: $ 335.80
Current price is: $ 335.80.

You Save: $274.70 - 45.00% OFF

Add to cart
Perla 36″ Square Corner Base Cabinet

Perla 36″ Square Corner Base Cabinet

SKU: CS-PE-BLS36N
Width: 36" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,704.70
Original price was: $ 1,704.70.
Our Price: $ 937.60
Current price is: $ 937.60.

You Save: $767.10 - 45.00% OFF

Add to cart
Perla 36″ Double Door Sink Base Cabinet

Perla 36″ Double Door Sink Base Cabinet

SKU: CS-PE-SB36
Width: 36" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,048.00
Original price was: $ 1,048.00.
Our Price: $ 576.40
Current price is: $ 576.40.

You Save: $471.60 - 45.00% OFF

Add to cart
Perla 15″ Three Drawer Base Cabinet

Perla 15″ Three Drawer Base Cabinet

SKU: CS-PE-DB15-3
Width: 15" | Height: 34 1/2" | Depth: 24"
List Price: $ 755.50
Original price was: $ 755.50.
Our Price: $ 415.50
Current price is: $ 415.50.

You Save: $340.00 - 45.00% OFF

Add to cart
Perla Dishwasher Panel with 3″ Return

Perla Dishwasher Panel with 3″ Return

SKU: CS-PE-DWP
Width: 3" | Height: 34 1/2" | Depth: 24"
List Price: $ 156.50
Original price was: $ 156.50.
Our Price: $ 86.10
Current price is: $ 86.10.

You Save: $70.40 - 44.98% OFF

Add to cart
Perla 24×30 Decorator Matching Door

Perla 24×30 Decorator Matching Door

SKU: CS-PE-BDD24
Width: 24" | Height: 30" | Depth: 3/4"
List Price: $ 313.20
Original price was: $ 313.20.
Our Price: $ 172.20
Current price is: $ 172.20.

You Save: $141.00 - 45.02% OFF

Add to cart
Perla ROT18 Roll Out Drawer

Perla ROT18 Roll Out Drawer

SKU: CS-PE-ROT18
Width: 14 1/4" | Height: 21" | Depth: 4"
List Price: $ 166.60
Original price was: $ 166.60.
Our Price: $ 91.70
Current price is: $ 91.70.

You Save: $74.90 - 44.96% OFF

Add to cart
Perla Trash Can

Perla Trash Can

SKU: CS-PE-RV358
Width: 14 3/8" | Height: 17 1/8" | Depth: 10 1/2"
List Price: $ 88.80
Original price was: $ 88.80.
Our Price: $ 48.80
Current price is: $ 48.80.

You Save: $40.00 - 45.05% OFF

Add to cart
Perla 3×30 Wall Filler

Perla 3×30 Wall Filler

SKU: CS-PE-WF330
Width: 3" | Height: 30" | Depth: 3/4"
List Price: $ 50.20
Original price was: $ 50.20.
Our Price: $ 27.60
Current price is: $ 27.60.

You Save: $22.60 - 45.02% OFF

Add to cart
Perla 15″ Three Drawer Vanity Base

Perla 15″ Three Drawer Vanity Base

SKU: CS-PE-SVA15D
Width: 15" | Height: 34 1/2" | Depth: 21"
List Price: $ 815.50
Original price was: $ 815.50.
Our Price: $ 448.50
Current price is: $ 448.50.

You Save: $367.00 - 45.00% OFF

Add to cart
Perla 24×42 Wall Diagonal Corner Cabinet

Perla 24×42 Wall Diagonal Corner Cabinet

SKU: CS-PE-WDC2442
Width: 24" | Height: 42" | Depth: 12"
List Price: $ 915.90
Original price was: $ 915.90.
Our Price: $ 503.80
Current price is: $ 503.80.

You Save: $412.10 - 44.99% OFF

Add to cart
Perla 30×42 Double Door Wall Cabinet

Perla 30×42 Double Door Wall Cabinet

SKU: CS-PE-W3042
Width: 30" | Height: 42" | Depth: 12"
List Price: $ 926.70
Original price was: $ 926.70.
Our Price: $ 509.70
Current price is: $ 509.70.

You Save: $417.00 - 45.00% OFF

Add to cart
Perla 27×42 Double Door Wall Cabinet

Perla 27×42 Double Door Wall Cabinet

SKU: CS-PE-W2742
Width: 27" | Height: 42" | Depth: 12"
List Price: $ 886.40
Original price was: $ 886.40.
Our Price: $ 487.50
Current price is: $ 487.50.

You Save: $398.90 - 45.00% OFF

Add to cart
Perla 21×42 Single Door Wall Cabinet

Perla 21×42 Single Door Wall Cabinet

SKU: CS-PE-W2142
Width: 21" | Height: 42" | Depth: 12"
List Price: $ 705.00
Original price was: $ 705.00.
Our Price: $ 387.80
Current price is: $ 387.80.

You Save: $317.20 - 44.99% OFF

Add to cart
Perla 21″ Three Drawer Base Cabinet

Perla 21″ Three Drawer Base Cabinet

SKU: CS-PE-DB21-3
Width: 21" | Height: 34 1/2" | Depth: 24"
List Price: $ 886.40
Original price was: $ 886.40.
Our Price: $ 487.50
Current price is: $ 487.50.

You Save: $398.90 - 45.00% OFF

Add to cart
Perla Sample Door

Perla Sample Door

SKU: CS-PE-SAMPLE DOOR
Width: - | Height: - | Depth: -
List Price: $ 63.00
Original price was: $ 63.00.
Our Price: $ 25.00
Current price is: $ 25.00.

You Save: $38.00 - 60.32% OFF

Add to cart
Perla 18″ Single Drawer, Single Door Base Cabinet

Perla 18″ Single Drawer, Single Door Base Cabinet

SKU: CS-PE-B18
Width: 18" | Height: 34 1/2" | Depth: 24"
List Price: $ 613.40
Original price was: $ 613.40.
Our Price: $ 337.40
Current price is: $ 337.40.

You Save: $276.00 - 45.00% OFF

Add to cart
Perla 12×36 Decorator Matching Door

Perla 12×36 Decorator Matching Door

SKU: CS-PE-D1236
Width: 12" | Height: 36" | Depth: 3/4"
List Price: $ 192.00
Original price was: $ 192.00.
Our Price: $ 105.60
Current price is: $ 105.60.

You Save: $86.40 - 45.00% OFF

Add to cart
Perla 12×49 Decorator Matching Door for Tall Cabinets

Perla 12×49 Decorator Matching Door for Tall Cabinets

SKU: CS-PE-D1249
Width: 12" | Height: 49 1/4" | Depth: 3/4"
List Price: $ 262.40
Original price was: $ 262.40.
Our Price: $ 144.30
Current price is: $ 144.30.

You Save: $118.10 - 45.01% OFF

Add to cart
Perla Refrigerator Panel with 3″ Return

Perla Refrigerator Panel with 3″ Return

SKU: CS-PE-RRP96
Width: 3" | Height: 96" | Depth: 27"
List Price: $ 398.90
Original price was: $ 398.90.
Our Price: $ 219.40
Current price is: $ 219.40.

You Save: $179.50 - 45.00% OFF

Add to cart
Perla Waste Basket Double Pull Out

Perla Waste Basket Double Pull Out

SKU: CS-PE-WBS18-2
Width: 14 1/4" | Height: 17 1/2" | Depth: 21"
List Price: $ 271.00
Original price was: $ 271.00.
Our Price: $ 149.00
Current price is: $ 149.00.

You Save: $122.00 - 45.02% OFF

Add to cart
Perla 6×30 Wall Filler

Perla 6×30 Wall Filler

SKU: CS-PE-WF630
Width: 6" | Height: 30" | Depth: 3/4"
List Price: $ 91.60
Original price was: $ 91.60.
Our Price: $ 50.40
Current price is: $ 50.40.

You Save: $41.20 - 44.98% OFF

Add to cart
Perla 3×42 Wall Filler

Perla 3×42 Wall Filler

SKU: CS-PE-WF342
Width: 3" | Height: 42" | Depth: 3/4"
List Price: $ 62.00
Original price was: $ 62.00.
Our Price: $ 34.10
Current price is: $ 34.10.

You Save: $27.90 - 45.00% OFF

Add to cart
Perla Base Board Molding

Perla Base Board Molding

SKU: CS-PE-BM8
Width: 4 1/2" | Height: 3/4" | Depth: 96"
List Price: $ 236.30
Original price was: $ 236.30.
Our Price: $ 130.00
Current price is: $ 130.00.

You Save: $106.30 - 44.99% OFF

Add to cart
Perla 24″ Double Door Vanity Sink Base

Perla 24″ Double Door Vanity Sink Base

SKU: CS-PE-FA2421
Width: 24" | Height: 34 1/2" | Depth: 21"
List Price: $ 679.50
Original price was: $ 679.50.
Our Price: $ 373.70
Current price is: $ 373.70.

You Save: $305.80 - 45.00% OFF

Add to cart
Perla 18×96 Single Door Tall Pantry Cabinet

Perla 18×96 Single Door Tall Pantry Cabinet

SKU: CS-PE-WP1896
Width: 18" | Height: 96" | Depth: 24"
List Price: $ 1,922.50
Original price was: $ 1,922.50.
Our Price: $ 1,057.40
Current price is: $ 1,057.40.

You Save: $865.10 - 45.00% OFF

Add to cart
Perla 18×84 Single Door Tall Pantry Cabinet

Perla 18×84 Single Door Tall Pantry Cabinet

SKU: CS-PE-WP1884
Width: 18" | Height: 84" | Depth: 24"
List Price: $ 1,735.70
Original price was: $ 1,735.70.
Our Price: $ 954.60
Current price is: $ 954.60.

You Save: $781.10 - 45.00% OFF

Add to cart
Perla 36×42 Double Door Wall Cabinet

Perla 36×42 Double Door Wall Cabinet

SKU: CS-PE-W3642
Width: 36" | Height: 42" | Depth: 12"
List Price: $ 1,031.50
Original price was: $ 1,031.50.
Our Price: $ 567.30
Current price is: $ 567.30.

You Save: $464.20 - 45.00% OFF

Add to cart
Perla 33×42 Double Door Wall Cabinet

Perla 33×42 Double Door Wall Cabinet

SKU: CS-PE-W3342
Width: 33" | Height: 42" | Depth: 12"
List Price: $ 1,004.50
Original price was: $ 1,004.50.
Our Price: $ 552.50
Current price is: $ 552.50.

You Save: $452.00 - 45.00% OFF

Add to cart
Perla 24×42 Double Door Wall Cabinet

Perla 24×42 Double Door Wall Cabinet

SKU: CS-PE-W2442
Width: 24" | Height: 42" | Depth: 12"
List Price: $ 719.40
Original price was: $ 719.40.
Our Price: $ 395.70
Current price is: $ 395.70.

You Save: $323.70 - 45.00% OFF

Add to cart
Perla 33×36 Double Door Wall Cabinet

Perla 33×36 Double Door Wall Cabinet

SKU: CS-PE-W3336
Width: 33" | Height: 36" | Depth: 12"
List Price: $ 921.60
Original price was: $ 921.60.
Our Price: $ 506.90
Current price is: $ 506.90.

You Save: $414.70 - 45.00% OFF

Add to cart
Perla 15×42 Single Door Wall Cabinet

Perla 15×42 Single Door Wall Cabinet

SKU: CS-PE-W1542
Width: 15" | Height: 42" | Depth: 12"
List Price: $ 558.90
Original price was: $ 558.90.
Our Price: $ 307.40
Current price is: $ 307.40.

You Save: $251.50 - 45.00% OFF

Add to cart
Perla 12×42 Single Door Wall Cabinet

Perla 12×42 Single Door Wall Cabinet

SKU: CS-PE-W1242
Width: 12" | Height: 42" | Depth: 12"
List Price: $ 462.00
Original price was: $ 462.00.
Our Price: $ 254.10
Current price is: $ 254.10.

You Save: $207.90 - 45.00% OFF

Add to cart
Perla 33″ Square Corner Base Cabinet

Perla 33″ Square Corner Base Cabinet

SKU: CS-PE-BLS33N
Width: 33" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,597.30
Original price was: $ 1,597.30.
Our Price: $ 878.50
Current price is: $ 878.50.

You Save: $718.80 - 45.00% OFF

Add to cart
Perla 39″ Base Blind Corner Cabinet

Perla 39″ Base Blind Corner Cabinet

SKU: CS-PE-BBC39
Width: 39" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,060.70
Original price was: $ 1,060.70.
Our Price: $ 583.40
Current price is: $ 583.40.

You Save: $477.30 - 45.00% OFF

Add to cart
Perla 33″ Double Door Sink Base Cabinet

Perla 33″ Double Door Sink Base Cabinet

SKU: CS-PE-SB33
Width: 33" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,017.90
Original price was: $ 1,017.90.
Our Price: $ 559.90
Current price is: $ 559.90.

You Save: $458.00 - 44.99% OFF

Add to cart
Perla 24″ Three Drawer Base Cabinet

Perla 24″ Three Drawer Base Cabinet

SKU: CS-PE-DB24-3
Width: 24" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,016.50
Original price was: $ 1,016.50.
Our Price: $ 559.10
Current price is: $ 559.10.

You Save: $457.40 - 45.00% OFF

Add to cart
Perla 18″ Three Drawer Base Cabinet

Perla 18″ Three Drawer Base Cabinet

SKU: CS-PE-DB18-3
Width: 18" | Height: 34 1/2" | Depth: 24"
List Price: $ 815.50
Original price was: $ 815.50.
Our Price: $ 448.50
Current price is: $ 448.50.

You Save: $367.00 - 45.00% OFF

Add to cart
Perla 30″ Single Drawer, Double Door Base Cabinet

Perla 30″ Single Drawer, Double Door Base Cabinet

SKU: CS-PE-B30
Width: 30" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,021.80
Original price was: $ 1,021.80.
Our Price: $ 562.00
Current price is: $ 562.00.

You Save: $459.80 - 45.00% OFF

Add to cart
Perla 24″ Single Drawer, Double Door Base Cabinet

Perla 24″ Single Drawer, Double Door Base Cabinet

SKU: CS-PE-B24
Width: 24" | Height: 34 1/2" | Depth: 24"
List Price: $ 766.10
Original price was: $ 766.10.
Our Price: $ 421.40
Current price is: $ 421.40.

You Save: $344.70 - 44.99% OFF

Add to cart
Perla 36″ Skin Panel

Perla 36″ Skin Panel

SKU: CS-PE-BP3696
Width: 36" | Height: 96" | Depth: 1/4"
List Price: $ 244.90
Original price was: $ 244.90.
Our Price: $ 134.70
Current price is: $ 134.70.

You Save: $110.20 - 45.00% OFF

Add to cart
Perla 3×36 Wall Filler

Perla 3×36 Wall Filler

SKU: CS-PE-WF336
Width: 3" | Height: 36" | Depth: 3/4"
List Price: $ 52.20
Original price was: $ 52.20.
Our Price: $ 28.70
Current price is: $ 28.70.

You Save: $23.50 - 45.02% OFF

Add to cart
Perla Outside Corner Molding

Perla Outside Corner Molding

SKU: CS-PE-OCM8
Width: 3/4" | Height: 3/4" | Depth: 96"
List Price: $ 56.20
Original price was: $ 56.20.
Our Price: $ 30.90
Current price is: $ 30.90.

You Save: $25.30 - 45.02% OFF

Add to cart
Perla 18×90 Single Door Tall Pantry Cabinet

Perla 18×90 Single Door Tall Pantry Cabinet

SKU: CS-PE-WP1890
Width: 18" | Height: 90" | Depth: 24"
List Price: $ 1,828.90
Original price was: $ 1,828.90.
Our Price: $ 1,005.90
Current price is: $ 1,005.90.

You Save: $823.00 - 45.00% OFF

Add to cart
Perla 36x18x24 Wall Refrigerator Cabinet

Perla 36x18x24 Wall Refrigerator Cabinet

SKU: CS-PE-W361824
Width: 36" | Height: 18" | Depth: 24"
List Price: $ 797.70
Original price was: $ 797.70.
Our Price: $ 438.70
Current price is: $ 438.70.

You Save: $359.00 - 45.00% OFF

Add to cart
Perla 30×15 Double Door Wall Bridge Cabinet

Perla 30×15 Double Door Wall Bridge Cabinet

SKU: CS-PE-W3015
Width: 30" | Height: 15" | Depth: 12"
List Price: $ 447.80
Original price was: $ 447.80.
Our Price: $ 246.30
Current price is: $ 246.30.

You Save: $201.50 - 45.00% OFF

Add to cart
Perla 12×36 Double Door Wall End Cabinet

Perla 12×36 Double Door Wall End Cabinet

SKU: CS-PE-WEC1236
Width: 12" | Height: 36" | Depth: 12"
List Price: $ 447.80
Original price was: $ 447.80.
Our Price: $ 246.30
Current price is: $ 246.30.

You Save: $201.50 - 45.00% OFF

Add to cart
Perla 24×36 Easy Reach Corner Wall Cabinet

Perla 24×36 Easy Reach Corner Wall Cabinet

SKU: CS-PE-WLS2436
Width: 24" | Height: 36" | Depth: 12"
List Price: $ 848.00
Original price was: $ 848.00.
Our Price: $ 466.40
Current price is: $ 466.40.

You Save: $381.60 - 45.00% OFF

Add to cart
Perla 24×36 Wall Diagonal Corner Cabinet

Perla 24×36 Wall Diagonal Corner Cabinet

SKU: CS-PE-WDC2436
Width: 24" | Height: 36" | Depth: 12"
List Price: $ 848.00
Original price was: $ 848.00.
Our Price: $ 466.40
Current price is: $ 466.40.

You Save: $381.60 - 45.00% OFF

Add to cart
Perla 36×36 Double Door Wall Cabinet

Perla 36×36 Double Door Wall Cabinet

SKU: CS-PE-W3636
Width: 36" | Height: 36" | Depth: 12"
List Price: $ 965.50
Original price was: $ 965.50.
Our Price: $ 531.00
Current price is: $ 531.00.

You Save: $434.50 - 45.00% OFF

Add to cart
Perla 21×36 Single Door Wall Cabinet

Perla 21×36 Single Door Wall Cabinet

SKU: CS-PE-W2136
Width: 21" | Height: 36" | Depth: 12"
List Price: $ 666.40
Original price was: $ 666.40.
Our Price: $ 366.50
Current price is: $ 366.50.

You Save: $299.90 - 45.00% OFF

Add to cart
Perla 30″ Three Drawer Base Cabinet

Perla 30″ Three Drawer Base Cabinet

SKU: CS-PE-DB30-3
Width: 30" | Height: 34 1/2" | Depth: 24"
List Price: $ 1,221.40
Original price was: $ 1,221.40.
Our Price: $ 671.80
Current price is: $ 671.80.

You Save: $549.60 - 45.00% OFF

Add to cart
Perla 12″ Single Drawer, Single Door Base Cabinet

Perla 12″ Single Drawer, Single Door Base Cabinet

SKU: CS-PE-B12
Width: 12" | Height: 34 1/2" | Depth: 24"
List Price: $ 484.50
Original price was: $ 484.50.
Our Price: $ 266.50
Current price is: $ 266.50.

You Save: $218.00 - 44.99% OFF

Add to cart
Perla PS3 Turn Post

Perla PS3 Turn Post

SKU: CS-PE-PS3
Width: 3" | Height: 3" | Depth: 34 1/2"
List Price: $ 383.50
Original price was: $ 383.50.
Our Price: $ 210.90
Current price is: $ 210.90.

You Save: $172.60 - 45.01% OFF

Add to cart
Perla 72″ Valance

Perla 72″ Valance

SKU: CS-PE-V72SH
Width: 72" | Height: 5 1/2" | Depth: 3/4"
List Price: $ 162.50
Original price was: $ 162.50.
Our Price: $ 89.40
Current price is: $ 89.40.

You Save: $73.10 - 44.98% OFF

Add to cart
Perla Spray Can

Perla Spray Can

SKU: CS-PE-SPRAY CAN
Width: - | Height: - | Depth: -
List Price: $ 118.40
Original price was: $ 118.40.
Our Price: $ 61.30
Current price is: $ 61.30.

You Save: $57.10 - 48.23% OFF

Add to cart
Perla 18×30 Decorator Matching Door

Perla 18×30 Decorator Matching Door

SKU: CS-PE-D1830
Width: 18" | Height: 30" | Depth: 3/4"
List Price: $ 236.10
Original price was: $ 236.10.
Our Price: $ 129.90
Current price is: $ 129.90.

You Save: $106.20 - 44.98% OFF

Add to cart
Perla 15×30 Decorator Matching Door

Perla 15×30 Decorator Matching Door

SKU: CS-PE-D1530
Width: 15" | Height: 30" | Depth: 3/4"
List Price: $ 196.90
Original price was: $ 196.90.
Our Price: $ 108.30
Current price is: $ 108.30.

You Save: $88.60 - 45.00% OFF

Add to cart
Perla 12×42 Decorator Matching Door

Perla 12×42 Decorator Matching Door

SKU: CS-PE-D1242
Width: 12" | Height: 42" | Depth: 3/4"
List Price: $ 218.60
Original price was: $ 218.60.
Our Price: $ 120.20
Current price is: $ 120.20.

You Save: $98.40 - 45.01% OFF

Add to cart
Perla 12×30 Decorator Matching Door

Perla 12×30 Decorator Matching Door

SKU: CS-PE-D1230
Width: 12" | Height: 30" | Depth: 3/4"
List Price: $ 156.50
Original price was: $ 156.50.
Our Price: $ 86.10
Current price is: $ 86.10.

You Save: $70.40 - 44.98% OFF

Add to cart
Perla 21×30 Decorator Matching Door

Perla 21×30 Decorator Matching Door

SKU: CS-PE-D2130
Width: 21" | Height: 30" | Depth: 3/4"
List Price: $ 275.60
Original price was: $ 275.60.
Our Price: $ 151.60
Current price is: $ 151.60.

You Save: $124.00 - 44.99% OFF

Add to cart
Perla 33×42 Mullion Glass Door (Pair)

Perla 33×42 Mullion Glass Door (Pair)

SKU: CS-PE-WM3342
Width: 33" | Height: 42" | Depth: 3/4"
List Price: $ 462.70
Original price was: $ 462.70.
Our Price: $ 254.50
Current price is: $ 254.50.

You Save: $208.20 - 45.00% OFF

Add to cart
Perla 27×42 Mullion Glass Door (Pair)

Perla 27×42 Mullion Glass Door (Pair)

SKU: CS-PE-WM2742
Width: 27" | Height: 42" | Depth: 3/4"
List Price: $ 415.10
Original price was: $ 415.10.
Our Price: $ 228.30
Current price is: $ 228.30.

You Save: $186.80 - 45.00% OFF

Add to cart
Perla 33×36 Mullion Glass Door (Pair)

Perla 33×36 Mullion Glass Door (Pair)

SKU: CS-PE-WM3336
Width: 33" | Height: 36" | Depth: 3/4"
List Price: $ 442.50
Original price was: $ 442.50.
Our Price: $ 243.40
Current price is: $ 243.40.

You Save: $199.10 - 44.99% OFF

Add to cart
Perla 27×36 Mullion Glass Door (Pair)

Perla 27×36 Mullion Glass Door (Pair)

SKU: CS-PE-WM2736
Width: 27" | Height: 36" | Depth: 3/4"
List Price: $ 360.20
Original price was: $ 360.20.
Our Price: $ 198.10
Current price is: $ 198.10.

You Save: $162.10 - 45.00% OFF

Add to cart
Perla 33×30 Mullion Glass Door (Pair)

Perla 33×30 Mullion Glass Door (Pair)

SKU: CS-PE-WM3330
Width: 33" | Height: 30" | Depth: 3/4"
List Price: $ 374.00
Original price was: $ 374.00.
Our Price: $ 205.70
Current price is: $ 205.70.

You Save: $168.30 - 45.00% OFF

Add to cart
Perla 27×30 Mullion Glass Door (Pair)

Perla 27×30 Mullion Glass Door (Pair)

SKU: CS-PE-WM2730
Width: 27" | Height: 30" | Depth: 3/4"
List Price: $ 311.10
Original price was: $ 311.10.
Our Price: $ 171.10
Current price is: $ 171.10.

You Save: $140.00 - 45.00% OFF

Add to cart
Perla 21×42 Mullion Glass Door

Perla 21×42 Mullion Glass Door

SKU: CS-PE-WM2142
Width: 21" | Height: 42" | Depth: 3/4"
List Price: $ 276.30
Original price was: $ 276.30.
Our Price: $ 152.00
Current price is: $ 152.00.

You Save: $124.30 - 44.99% OFF

Add to cart
Perla 18×42 Mullion Glass Door

Perla 18×42 Mullion Glass Door

SKU: CS-PE-WM1842
Width: 18" | Height: 42" | Depth: 3/4"
List Price: $ 231.10
Original price was: $ 231.10.
Our Price: $ 127.10
Current price is: $ 127.10.

You Save: $104.00 - 45.00% OFF

Add to cart
Perla 15×42 Mullion Glass Door

Perla 15×42 Mullion Glass Door

SKU: CS-PE-WM1542
Width: 15" | Height: 42" | Depth: 3/4"
List Price: $ 202.50
Original price was: $ 202.50.
Our Price: $ 111.40
Current price is: $ 111.40.

You Save: $91.10 - 44.99% OFF

Add to cart
Perla 12×42 Mullion Glass Door

Perla 12×42 Mullion Glass Door

SKU: CS-PE-WM1242
Width: 12" | Height: 42" | Depth: 3/4"
List Price: $ 184.40
Original price was: $ 184.40.
Our Price: $ 101.40
Current price is: $ 101.40.

You Save: $83.00 - 45.01% OFF

Add to cart
Perla 21×36 Mullion Glass Door

Perla 21×36 Mullion Glass Door

SKU: CS-PE-WM2136
Width: 21" | Height: 36" | Depth: 3/4"
List Price: $ 271.80
Original price was: $ 271.80.
Our Price: $ 149.50
Current price is: $ 149.50.

You Save: $122.30 - 45.00% OFF

Add to cart
Perla 18×36 Mullion Glass Door

Perla 18×36 Mullion Glass Door

SKU: CS-PE-WM1836
Width: 18" | Height: 36" | Depth: 3/4"
List Price: $ 227.30
Original price was: $ 227.30.
Our Price: $ 125.00
Current price is: $ 125.00.

You Save: $102.30 - 45.01% OFF

Add to cart
Perla 15×36 Mullion Glass Door

Perla 15×36 Mullion Glass Door

SKU: CS-PE-WM1536
Width: 15" | Height: 36" | Depth: 3/4"
List Price: $ 193.60
Original price was: $ 193.60.
Our Price: $ 106.50
Current price is: $ 106.50.

You Save: $87.10 - 44.99% OFF

Add to cart
Perla 12×36 Mullion Glass Door

Perla 12×36 Mullion Glass Door

SKU: CS-PE-WM1236
Width: 12" | Height: 36" | Depth: 3/4"
List Price: $ 160.00
Original price was: $ 160.00.
Our Price: $ 88.00
Current price is: $ 88.00.

You Save: $72.00 - 45.00% OFF

Add to cart
Perla 21×30 Mullion Glass Door

Perla 21×30 Mullion Glass Door

SKU: CS-PE-WM2130
Width: 21" | Height: 30" | Depth: 3/4"
List Price: $ 227.50
Original price was: $ 227.50.
Our Price: $ 125.10
Current price is: $ 125.10.

You Save: $102.40 - 45.01% OFF

Add to cart
Perla 18×30 Mullion Glass Door

Perla 18×30 Mullion Glass Door

SKU: CS-PE-WM1830
Width: 18" | Height: 30" | Depth: 3/4"
List Price: $ 190.20
Original price was: $ 190.20.
Our Price: $ 104.60
Current price is: $ 104.60.

You Save: $85.60 - 45.01% OFF

Add to cart
Perla 15×30 Mullion Glass Door

Perla 15×30 Mullion Glass Door

SKU: CS-PE-WM1530
Width: 15" | Height: 30" | Depth: 3/4"
List Price: $ 163.70
Original price was: $ 163.70.
Our Price: $ 90.00
Current price is: $ 90.00.

You Save: $73.70 - 45.02% OFF

Add to cart
Perla 12×30 Mullion Glass Door

Perla 12×30 Mullion Glass Door

SKU: CS-PE-WM1230
Width: 12" | Height: 30" | Depth: 3/4"
List Price: $ 138.30
Original price was: $ 138.30.
Our Price: $ 76.10
Current price is: $ 76.10.

You Save: $62.20 - 44.97% OFF

Add to cart
Perla 24″ Soft Closing Undermount Glide

Perla 24″ Soft Closing Undermount Glide

SKU: CS-PE-GLIDE24
Width: - | Height: - | Depth: -
List Price: $ 80.70
Original price was: $ 80.70.
Our Price: $ 44.40
Current price is: $ 44.40.

You Save: $36.30 - 44.98% OFF

Add to cart
Perla 21″ Soft Closing Undermount Glide

Perla 21″ Soft Closing Undermount Glide

SKU: CS-PE-GLIDE21
Width: - | Height: - | Depth: -
List Price: $ 80.70
Original price was: $ 80.70.
Our Price: $ 44.40
Current price is: $ 44.40.

You Save: $36.30 - 44.98% OFF

Add to cart
Perla 18″ Soft Closing Undermount Glide

Perla 18″ Soft Closing Undermount Glide

SKU: CS-PE-GLIDE18
Width: - | Height: - | Depth: -
List Price: $ 80.70
Original price was: $ 80.70.
Our Price: $ 44.40
Current price is: $ 44.40.

You Save: $36.30 - 44.98% OFF

Add to cart
Perla 15″ Soft Closing Undermount Glide

Perla 15″ Soft Closing Undermount Glide

SKU: CS-PE-GLIDE15
Width: - | Height: - | Depth: -
List Price: $ 80.70
Original price was: $ 80.70.
Our Price: $ 44.40
Current price is: $ 44.40.

You Save: $36.30 - 44.98% OFF

Add to cart
Perla 12″ Soft Closing Undermount Glide

Perla 12″ Soft Closing Undermount Glide

SKU: CS-PE-GLIDE12
Width: - | Height: - | Depth: -
List Price: $ 80.70
Original price was: $ 80.70.
Our Price: $ 44.40
Current price is: $ 44.40.

You Save: $36.30 - 44.98% OFF

Add to cart
Perla 48″ Panel

Perla 48″ Panel

SKU: CS-PE-FP4896
Width: 48" | Height: 96" | Depth: 3/4"
List Price: $ 576.20
Original price was: $ 576.20.
Our Price: $ 316.90
Current price is: $ 316.90.

You Save: $259.30 - 45.00% OFF

Add to cart