Double Shaker White
Our Double Shaker White Cabinets offer high-end features and chic minimalism that will elevate your home. The cabinets come with full overlay doors and drawers made from 3/4″ thick panels for durability. The 6-way adjustable European style hinges are fully concealed and soft-closing, while the adjustable shelves and metal shelf rests make it easy to customize your storage. The drawer boxes are dovetailed and 1/2″ thick with solid wood side panels, and the under-mount glide system is soft-closing for added convenience. These double inlay shaker door cabinets are made from 1/2″ thick grade plywood and are Carb2 compliant, with a 3-year manufacturer warranty for peace of mind. Thank you for choosing the Double Shaker White Cabinets!
Double Shaker White kitchen cabinet line features:
- Chic, modern look at an affordable price
- High-quality materials and construction
- Easy to assemble and install yourself
- 3 Year Manufacturer’s Warranty
Give your kitchen the update it deserves with our Double Shaker White Cabinets!
- Full Overlay Doors and Drawers, 3/4″ Thick Panels
- 6 Way Adjustable European Style Fully Concealed Soft-Closing Hinges
- Adjustable 3/4″ Shelf, 1/2″ Cabinet Grade Plywood, Metal Shelf Rests
- Dovetail Drawer 1/2″ Thick Solid Wood Side Panels Without Finger Joints
- Full Extension Soft-Closing Under-Mount Concealed Glide System
- 1/2″ Thick Grade Plywood Box Construction
- Metal Brackets Reinforcements for Base Cabinets
- Double Doweled Face Frame Joint
- Assemble in 15-20 minutes
- Carb2 Compliant Certification
- 3 Year Manufacturer Warranty
- Flat Pack / Ready to Assemble Cabinets
Base Cabinet Assembly
Base End Cabinet Assembly
Drawer Base Assembly
Base Spice Rack Assembly
Blind Base Cabinet Assembly
Lazy Susan Assembly
Waste Basket Assembly
Pot & Pan Roll Out Assembly
Wall Cabinet Assembly
Wall End Cabinet Assembly
Wall Diagonal Corner Assembly
Easy Reach Wall Cabinet Assembly
Hearth Spice Pull Out Assembly
Wine Rack Assembly
Install Soft Closing Drawer Slides
Utensil Drawer Assembly
Quick-tip Marker, Stained Cabinets
Quick-tip Marker, Painted Cabinets
Touch Up Kit Fill Stick
How To Use The Aerosol Painted Cabinet Spray Can Kit
How To Use The Aerosol Toner Stain Spray Can Kit
| Shipping Time: | 5 to 15 business days |
| Style: | Transitional Style Door, Full Overlay |
| Side Panels: | Finished Side Panels |
| Face Frame: | 3/4″ x 1 1/2″ Hardwood Face Frame |
| Door Frame: | 3/4″ Birch wood cosntruction |
| Door Center: | Reversed Raised Panel |
| Sides: | 1/2″ Thick Grade Plywood |
| Top & Bottom (Wall): | 1/2″ Thick Grade Plywood |
| Bottom (Base): | 1/2″ Thick Grade Plywood |
| Back Panel: | 1/2″ Thick Grade Plywood |
| Shelves: | 3/4″ Adjustable Shelves |
| Base Cabinet Shelf Depth: | 18″ Deep Base Shelves |
| Drawer Boxes: | Dovetail Drawer 5/8″ Thick Solid Wood Side Panels |
| Drawer Glides: | Full Extension Soft-Closing Under-Mount Glide System |
| Base Corner Supports: | Metal Brackets Reinforcements |
| Hinges: | European Style Fully Concealed Soft-Closing Hinges |
| Cabinet Interior: | Clear Coated Natural Maple Finish Interior |
| Cabinet Interior with Glass | Clear Coated Natural Maple Finish Interior |
| Assembly Method: | Glue & Staple or Metal Clip Assembly |
| Finish: | White Color |
| Toe Kick: | 1/2″ Plywood, 4 1/2″ H Toe Kick Area |
| Wall Cabinet Bottoms: | 1/2 Plywood |
| Certifications | CARB2 Compliant |
| Door Hinges: | DTC 6-way- Adjustable, Concealed, with soft Close Integrated hinge |
| Notes: |
Double Shaker White Toe Kick
Width: 4 1/2" | Height: 1/4" | Depth: 96"
You Save: $23.40 - 44.91% OFF
Double Shaker White Touch Up Kit
Width: - | Height: - | Depth: -
You Save: $42.80 - 48.20% OFF
Double Shaker White Sample Door
Width: - | Height: - | Depth: -
You Save: $38.00 - 60.32% OFF
Double Shaker White Scribe Molding
Width: 3/4" | Height: 1/4" | Depth: 96"
You Save: $20.80 - 44.92% OFF
Double Shaker White 3″ Base Filler
Width: 3" | Height: 34 1/2" | Depth: 3/4"
You Save: $30.00 - 45.05% OFF
Double Shaker White Angle Crown Molding (A)
Width: - | Height: 3 1/4" | Depth: 96"
You Save: $130.30 - 44.99% OFF
Double Shaker White 30″ Single Drawer, Double Door Base Cabinet
Width: 30" | Height: 34 1/2" | Depth: 24"
You Save: $450.80 - 45.00% OFF
Double Shaker White 27×30 Double Door Wall Cabinet
Width: 27" | Height: 30" | Depth: 12"
You Save: $305.40 - 45.00% OFF
Double Shaker White 36″ Panel
Width: 36" | Height: 96" | Depth: 3/4"
You Save: $192.30 - 44.99% OFF
Double Shaker White 15″ Three Drawer Base Cabinet
Width: 15" | Height: 34 1/2" | Depth: 24"
You Save: $333.30 - 45.00% OFF
Double Shaker White 33″ Double Drawer, Double Door Base Cabinet
Width: 33" | Height: 34 1/2" | Depth: 24"
You Save: $474.20 - 45.00% OFF
Double Shaker White 24×30 Decorator Matching Door
Width: 24" | Height: 30" | Depth: 3/4"
You Save: $138.20 - 45.02% OFF
Double Shaker White 12×42 Glass Door
Width: 12" | Height: 42" | Depth: 3/4"
You Save: $80.60 - 45.00% OFF
Double Shaker White 30×30 Double Door Wall Cabinet
Width: 30" | Height: 30" | Depth: 12"
You Save: $328.70 - 45.00% OFF
Double Shaker White 36″ Three Drawer Base Cabinet
Width: 36" | Height: 34 1/2" | Depth: 24"
You Save: $623.70 - 45.00% OFF
Double Shaker White 18″ Single Drawer, Single Door Base Cabinet
Width: 18" | Height: 34 1/2" | Depth: 24"
You Save: $270.60 - 45.00% OFF
Double Shaker White Dishwasher Panel with 3″ Return
Width: 3" | Height: 34 1/2" | Depth: 24"
You Save: $69.00 - 44.98% OFF
Double Shaker White 3×30 Wall Filler
Width: 3" | Height: 30" | Depth: 3/4"
You Save: $22.10 - 44.92% OFF
Double Shaker White Light Rail Molding
Width: 1 1/2" | Height: 2" | Depth: 96"
You Save: $69.30 - 44.97% OFF
Double Shaker White Base Board Molding
Width: 4 1/2" | Height: 3/4" | Depth: 96"
You Save: $104.30 - 45.02% OFF
Double Shaker White Cove Crown Molding
Width: - | Height: 2 1/2" | Depth: 96"
You Save: $91.30 - 45.02% OFF
Double Shaker White 30×42 Double Door Wall Cabinet
Width: 30" | Height: 42" | Depth: 12"
You Save: $408.90 - 45.00% OFF
Double Shaker White 27×42 Double Door Wall Cabinet
Width: 27" | Height: 42" | Depth: 12"
You Save: $391.10 - 45.01% OFF
Double Shaker White 12″ Three Drawer Base Cabinet
Width: 12" | Height: 34 1/2" | Depth: 24"
You Save: $325.90 - 45.00% OFF
Double Shaker White 21×30 Decorator Matching Door
Width: 21" | Height: 30" | Depth: 3/4"
You Save: $124.00 - 44.99% OFF
Double Shaker White 36″ Skin Panel
Width: 36" | Height: 96" | Depth: 1/4"
You Save: $108.00 - 44.98% OFF
Double Shaker White 3×96 Wall Filler
Width: 3" | Height: 96" | Depth: 3/4"
You Save: $70.40 - 45.01% OFF
Double Shaker White 30″ Knee Drawer
Width: 30" | Height: 7 1/2" | Depth: 21"
You Save: $221.60 - 45.00% OFF
Double Shaker White 36×42 Double Door Wall Cabinet
Width: 36" | Height: 42" | Depth: 12"
You Save: $455.00 - 45.00% OFF
Double Shaker White 12×36 Single Door Wall Cabinet
Width: 12" | Height: 36" | Depth: 12"
You Save: $192.60 - 44.99% OFF
Double Shaker White 24″ Base End Cabinet
Width: 24" | Height: 34 1/2" | Depth: 24"
You Save: $435.70 - 45.00% OFF
Double Shaker White 36″ Double Door Sink Base Cabinet
Width: 36" | Height: 34 1/2" | Depth: 24"
You Save: $462.30 - 45.00% OFF
Double Shaker White 18″ Three Drawer Base Cabinet
Width: 18" | Height: 34 1/2" | Depth: 24"
You Save: $359.80 - 45.00% OFF
Double Shaker White 36″ Double Drawer, Double Door Base Cabinet
Width: 36" | Height: 34 1/2" | Depth: 24"
You Save: $496.10 - 45.00% OFF
Double Shaker White 27″ Single Drawer, Double Door Base Cabinet
Width: 27" | Height: 34 1/2" | Depth: 24"
You Save: $394.50 - 45.00% OFF
Double Shaker White 12×36 Decorator Matching Door
Width: 12" | Height: 36" | Depth: 3/4"
You Save: $84.70 - 44.98% OFF
Double Shaker White Refrigerator Panel with 3″ Return
Width: 3" | Height: 96" | Depth: 27"
You Save: $175.90 - 44.99% OFF
Double Shaker White ROT30 Roll Out Drawer
Width: 27 1/4" | Height: 21" | Depth: 4"
You Save: $93.90 - 45.01% OFF
Double Shaker White 6×96 Wall Filler
Width: 6" | Height: 96" | Depth: 3/4"
You Save: $107.60 - 45.00% OFF
Double Shaker White 3×42 Wall Filler
Width: 3" | Height: 42" | Depth: 3/4"
You Save: $27.40 - 45.07% OFF
Double Shaker White Cove Crown Molding (A)
Width: - | Height: 2 1/2" | Depth: 96"
You Save: $130.30 - 44.99% OFF
Double Shaker White Scribe Molding Rounded
Width: 3/4" | Height: 1/4" | Depth: 96"
You Save: $20.80 - 44.92% OFF
Double Shaker White 12″ Three Drawer Vanity Base
Width: 12" | Height: 34 1/2" | Depth: 21"
You Save: $317.80 - 45.00% OFF
Double Shaker White 36x24x24 Wall Refrigerator Cabinet
Width: 36" | Height: 24" | Depth: 24"
You Save: $366.60 - 45.00% OFF
Double Shaker White 36×24 Double Door Wall Bridge Cabinet
Width: 36" | Height: 24" | Depth: 12"
You Save: $317.60 - 45.00% OFF
Double Shaker White 30×18 Double Door Wall Bridge Cabinet
Width: 30" | Height: 18" | Depth: 12"
You Save: $218.60 - 45.01% OFF
Double Shaker White 30×36 Double Door Wall Cabinet
Width: 30" | Height: 36" | Depth: 12"
You Save: $386.00 - 45.00% OFF
Double Shaker White 12×42 Single Door Wall Cabinet
Width: 12" | Height: 42" | Depth: 12"
You Save: $203.80 - 44.99% OFF
Double Shaker White 9×42 Single Door Wall Cabinet
Width: 9" | Height: 42" | Depth: 12"
You Save: $169.10 - 45.01% OFF
Double Shaker White 9″ Base Spice Pull Out
Width: 9" | Height: 34 1/2" | Depth: 24"
You Save: $237.20 - 44.99% OFF
Double Shaker White 27″ Base Microwave Cabinet
Width: 27" | Height: 34 1/2" | Depth: 24"
You Save: $430.30 - 45.00% OFF
Double Shaker White 24″ Double Door Sink Base Cabinet
Width: 24" | Height: 34 1/2" | Depth: 24"
You Save: $338.00 - 45.00% OFF
10×10 Double Shaker White Kitchen by CabinetSelect
Width: - | Height: - | Depth: -
You Save: $4,486.00 - 56.12% OFF
Double Shaker White 12×36 Glass Door
Width: 12" | Height: 36" | Depth: 3/4"
You Save: $69.90 - 44.98% OFF
Double Shaker White ROT27 Roll Out Drawer
Width: 24 1/4" | Height: 21" | Depth: 4"
You Save: $89.50 - 44.97% OFF
Double Shaker White Spray Can
Width: - | Height: - | Depth: -
You Save: $57.10 - 48.23% OFF
Double Shaker White 1.5×96 Wall Filler
Width: 1 1/2" | Height: 96" | Depth: 3/4"
You Save: $47.30 - 45.00% OFF
Double Shaker White 3×36 Wall Filler
Width: 3" | Height: 36" | Depth: 3/4"
You Save: $23.10 - 45.03% OFF
Double Shaker White Beveled Edge Molding
Width: 2 1/4" | Height: 3/4" | Depth: 96"
You Save: $70.80 - 44.98% OFF
Double Shaker White 9×36 Wall End Open Shelf
Width: 9" | Height: 36" | Depth: 12"
You Save: $177.60 - 45.00% OFF
Double Shaker White 30″ Double Door Vanity Sink Base
Width: 30" | Height: 34 1/2" | Depth: 21"
You Save: $391.10 - 45.01% OFF
Double Shaker White 96″ High, Double Door, Three Drawer Oven Pantry
Width: 31 1/2" | Height: 96" | Depth: 24"
You Save: $1,088.10 - 45.00% OFF
Double Shaker White 30×90 Double Door Tall Pantry Cabinet
Width: 30" | Height: 90" | Depth: 24"
You Save: $880.50 - 45.00% OFF
Double Shaker White 24×96 Double Door Tall Pantry Cabinet
Width: 24" | Height: 96" | Depth: 24"
You Save: $901.80 - 45.00% OFF
Double Shaker White 30×24 Double Door Wall Bridge Cabinet
Width: 30" | Height: 24" | Depth: 12"
You Save: $269.30 - 45.00% OFF
Double Shaker White 24×42 Double Door Wall Cabinet
Width: 24" | Height: 42" | Depth: 12"
You Save: $317.40 - 45.00% OFF
Double Shaker White 33×36 Double Door Wall Cabinet
Width: 33" | Height: 36" | Depth: 12"
You Save: $406.60 - 45.00% OFF
Double Shaker White 15×42 Single Door Wall Cabinet
Width: 15" | Height: 42" | Depth: 12"
You Save: $246.60 - 45.01% OFF
Double Shaker White 18×36 Single Door Wall Cabinet
Width: 18" | Height: 36" | Depth: 12"
You Save: $248.00 - 45.00% OFF
Double Shaker White 18×30 Single Door Wall Cabinet
Width: 18" | Height: 30" | Depth: 12"
You Save: $226.40 - 45.01% OFF
Double Shaker White 33″ Square Corner Base Cabinet
Width: 33" | Height: 34 1/2" | Depth: 24"
You Save: $704.60 - 45.00% OFF
Double Shaker White 42″ Base Blind Corner Cabinet
Width: 42" | Height: 34 1/2" | Depth: 24"
You Save: $530.50 - 45.00% OFF
Double Shaker White 39″ Base Blind Corner Cabinet
Width: 39" | Height: 34 1/2" | Depth: 24"
You Save: $468.00 - 45.00% OFF
Double Shaker White 33″ Double Door Sink Base Cabinet
Width: 33" | Height: 34 1/2" | Depth: 24"
You Save: $449.10 - 45.00% OFF
Double Shaker White 30″ Three Drawer Base Cabinet
Width: 30" | Height: 34 1/2" | Depth: 24"
You Save: $538.90 - 45.00% OFF
Double Shaker White 15″ Single Drawer, Single Door Base Cabinet
Width: 15" | Height: 34 1/2" | Depth: 24"
You Save: $248.00 - 45.00% OFF
Double Shaker White 24″ Panel
Width: 24" | Height: 96" | Depth: 3/4"
You Save: $150.60 - 45.00% OFF
Double Shaker White 48″ Skin Panel
Width: 48" | Height: 96" | Depth: 1/4"
You Save: $143.30 - 44.99% OFF
Double Shaker White ROT33 Roll Out Drawer
Width: 30 1/4" | Height: 21" | Depth: 4"
You Save: $96.70 - 45.02% OFF
Double Shaker White Waste Basket Single Pull Out
Width: 11 1/4" | Height: 17 1/2" | Depth: 21"
You Save: $113.90 - 45.00% OFF
Double Shaker White Waste Basket Double Pull Out
Width: 14 1/4" | Height: 17 1/2" | Depth: 21"
You Save: $121.90 - 44.98% OFF
Double Shaker White 36″ Raised Panel Door Valance
Width: 36" | Height: 12'' | Depth: 3/4"
You Save: $150.40 - 44.99% OFF
Double Shaker White 6×36 Wall Filler
Width: 6" | Height: 36" | Depth: 3/4"
You Save: $46.90 - 44.97% OFF
Double Shaker White 30″ Single Left Door, Double Drawer Vanity Sink Base
Width: 30" | Height: 34 1/2" | Depth: 21"
You Save: $469.30 - 45.00% OFF
Double Shaker White 30″ Single Right Door, Double Drawer Vanity Sink Base
Width: 30" | Height: 34 1/2" | Depth: 21"
You Save: $469.30 - 45.00% OFF
Double Shaker White 24″ Double Door Vanity Sink Base
Width: 24" | Height: 34 1/2" | Depth: 21"
You Save: $299.80 - 45.00% OFF
Double Shaker White 84″ High, Double Door, Three Drawer Oven Pantry
Width: 31 1/2" | Height: 84" | Depth: 24"
You Save: $1,026.80 - 45.00% OFF
Double Shaker White 30×96 Double Door Tall Pantry Cabinet
Width: 30" | Height: 96" | Depth: 24"
You Save: $924.00 - 45.00% OFF
Double Shaker White 30×84 Double Door Tall Pantry Cabinet
Width: 30" | Height: 84" | Depth: 24"
You Save: $846.20 - 45.00% OFF
Double Shaker White 18×90 Single Door Tall Pantry Cabinet
Width: 18" | Height: 90" | Depth: 24"
You Save: $806.90 - 45.00% OFF
Double Shaker White 36×18 Double Door Wall Bridge Cabinet
Width: 36" | Height: 18" | Depth: 12"
You Save: $251.50 - 45.01% OFF
Double Shaker White 12×42 Double Door Wall End Cabinet
Width: 12" | Height: 42" | Depth: 12"
You Save: $216.40 - 45.01% OFF
Double Shaker White 24×42 Easy Reach Corner Wall Cabinet
Width: 24" | Height: 42" | Depth: 12"
You Save: $404.10 - 45.00% OFF
Double Shaker White 24×36 Easy Reach Corner Wall Cabinet
Width: 24" | Height: 36" | Depth: 12"
You Save: $374.10 - 45.00% OFF
Double Shaker White 24×36 Wall Diagonal Corner Cabinet
Width: 24" | Height: 36" | Depth: 12"
You Save: $374.10 - 45.00% OFF
Double Shaker White 33×42 Double Door Wall Cabinet
Width: 33" | Height: 42" | Depth: 12"
You Save: $443.20 - 45.00% OFF


































































































